Title: Planejamento da colheita florestal: o uso da programação inteira
???metadata.dc.creator???: Fidelis, Alessandro Cruvinel
???metadata.dc.creator.Lattes???: http://lattes.cnpq.br/6532373062400023
???metadata.dc.contributor.advisor1???: Reis, Ricardo Pereira
???metadata.dc.contributor.referee1???: Reis, Antônio João do
???metadata.dc.contributor.referee2???: Castro Júnior, Luiz Gonzaga de
Keywords: Colheita
Florestas
Programação linear
Exploração florestal - Custos
Modelos matemáticos
Harvesting
Forests and forestry
Linear programming
Mathematical models
???metadata.dc.date.submitted???: 7-Jul-1999
Issue Date: 2016
Citation: FIDELIS, A. C. Planejamento da colheita florestal: o uso da programação inteira. 1999. 42 p. Dissertação (Mestrado em Administração Rural)-Universidade Federal de Lavras, Lavras, 1999.
???metadata.dc.description.resumo???: No Brasil, a colheita florestal vem sendo planejada de acordo com técnicas obsoletas e intuitivas, embora seja a atividade que mais onera o custo de produção da madeira. O presente estudo foi realizado em áreas florestadas de Eucalyptus urophylla na região Norte de Minas, município de Bocaiúva com o objetivo de propor um modelo matemático para apoiar a tomada de decisão no planejamento bianual da colheita florestal. Foram disponibilizadas 204 (duzentas e quatro) glebas para corte com produtividade média de 205 estéreos/ha. O modelo proposto busca a otimização da colheita florestal, minimizando-se o custo de corte do trator florestal feller-buncher e atendendo à demanda por madeira da empresa. Foi utilizada a técnica de Programação Inteira denominada Mixed Integer Programming, para a construção deste modelo. O custo hora do trator florestal feller-buncher foi de US$ 17,27 por hora total e US$ 25,58 por hora efetiva de trabalho. A capacidade de campo do trator florestal tende a diminuir com o aumento da produtividade da gleba, aumentando, portanto, o custo de corte por hectare, enquanto diminui o custo de corte por estéreo de madeira. Das 204 (duzentas quatro) glebas disponibilizadas, o modelo de apoio ao planejamento da colheita florestal-APCF 1 selecionou 46 para serem colhidas no primeiro ano e 42 no segundo, com um custo de corte de US$ 91.942,00 e US$ 79.379,00 respectivamente, atendendo a demanda de madeira da empresa. Os resultados obtidos permitiram verificar que a faixa ótima de produtividade das glebas disponibilizadas para corte encontra-se acima de 150 st/ha e a decisão de não colher glebas abaixo destes níveis pode representar uma economia de até US$70.000,00 ao ano. Ressalta-se que o modelo usado neste estudo pode ser empregado para apoiar o planejamento florestal em diferentes períodos, proporcionando a agilidade necessária à reprogramação de planos mediante flutuações futuras na disponibilidade de recursos.
Abstract: Forest harvest is the activity with the largest share in timber cost. Meanwhile, obsolete techniques have been applied in Brazil for the development of the forest harvest plan. This here study was carried out in a Eucalyptus urophylla forest, located in Bocaiúva town, north ofMinas Gerais state, Brazil. The first goal of this study was to develop a mathematical model to support harvest plan's decision-making for two years. The proposed model seeks the best alternative for reducing fell cost of feller-buncher forest tractor, attending the company's demand on wood. Integer Programming technique known as Mixed Integer Programming was used. The cost of feller-buncher was US$17.27for total clock hour and US$ 25.58 for each effectively worked hour. Increasing forest productivity tends to reduce feller-buncher's área productivity.. On the other hand, wood cost tends to reduce in function the increase in lhe volume of hourly-felled wood. Forty six áreas were selected by the APCF 1 model to be harvested during the first year and forty two in the second year, from a total of204 available áreas, with feller cost amounting to US$ 91,942.00 and US$ 79,379.00 respectively. This work demonstrated that the best productivity level to be felled is one above 150 st/ha and that decision-making can reduce cost by about US$ 70,000.00 per year. The developed model can be used to support forest planning in any time lapse, allowing for quick planning adjustments as for external changes.
Description: Dissertação/tese está disponível online com base na Resolução CEPE nº 090, de 24 de março de 2015, que dispõe sobre a disponibilização da coleção retrospectiva de teses e dissertações online no Repositório Institucional da UFLA, sem autorização prévia dos autores. Parágrafo Único. Caberá ao autor ou orientador a solicitação de restrição quanto à divulgação de teses e dissertações com pedidos de patente ou qualquer embargo similar. Art. 5º A obra depositada no RIUFLA que tenha direitos autorais externos à Universidade Federal de Lavras poderá ser removida mediante solicitação por escrito, exclusivamente do autor, encaminhada à Comissão Técnica da Biblioteca Universitária./ Arquivo gerado por meio da digitalização de material impresso. Alguns caracteres podem ter sido reconhecidos erroneamente.
URI: http://repositorio.ufla.br/jspui/handle/1/11799
Publisher: Universidade Federal de Lavras
???metadata.dc.language???: por
Appears in Collections:DAE - Administração - Mestrado (Dissertações)

Files in This Item:

File Description SizeFormat
DISSERTAÇÃO_Planejamento da colheita florestal o uso da programação inteira.pdf2.07 MBAdobe PDFView/Open

Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.


View Statistics

 


DSpace Software Copyright © 2002-2010  Duraspace - Feedback